KNITWEAR MANUFACTURING • FAISALABAD, PAKISTANLET'S TALK pak.jamsheed@gmail.com

INSIDE OUR FACTORY

Every step.
Under careful control.

Explore the people, processes and facilities behind our knitwear manufacturing.

Home / Every step.Under careful control.
05SEWING LINES
100SEWING MACHINES
3,000 KGKNITTING / DAY
60,000PCS CAPACITY*
VERTICALLY CONNECTED CAPABILITIES

A complete approach
to manufacturing.

The company profile describes a semi-vertically integrated model, with knitting in-house and dyeing and fabric finishing commercially outsourced.

Knitting Facility01

Knitting Facility

On-site knitting equipment with stated in-house output of 3,000 kg of knitted fabric per day.

Sewing & Assembly02

Sewing & Assembly

Five sewing lines with 20 machines each, totaling 100 sewing machines and specialized equipment.

Printing Facility03

Printing Facility

In-house printing with capabilities described for HTL, high-density and placement printing.

Embroidery Facility04

Embroidery Facility

Three embroidery machines with 20 heads each for customized decoration.

Fabric Cutting05

Fabric Cutting

Cutting, preparation and handling of fabric for production orders.

Finishing & Packing06

Finishing & Packing

Garment checks, pressing and careful packing before dispatch.

MACHINE & PROCESS DETAILS

Production specifications.

5 × 20

Sewing Lines

Five lines with 20 machines per line, plus elastic, button, buttonhole and bartack machines described in the company profile.

3 × 20

Embroidery Heads

The embroidery section is shown with three 20-head machines for apparel decoration.

3 Types

Printing

The profile lists HTL printing at 1,000 pcs, high-density printing at 1,000 pcs and placed printing at 2,000 pcs. It does not specify a time period.

OUTPUT AT A GLANCE

Manufacturing with measurable capacity.

Our company profile outlines daily sewing output benchmarks based on garment complexity and dedicated sewing lines.

1,250Fashion garments per day
1,875Basic / non-fashion garments per day

* The company profile lists “Capacity: 60,000 Pcs” without specifying a time period. Daily production outputs are listed separately.

Factory sewing lines in operation
FROM FABRIC TO FINISHED GARMENT

The manufacturing journey.

01

Fabric Knitting

Knitted fabric developed in-house.

02

Dyeing & Finishing

Commercially outsourced, then returned to our facility.

03

Cutting & Sewing

Fabric becomes carefully assembled garments.

04

Decoration

Printing and embroidery as required.

05

Final QC & Packing

Final checks before dispatch.